80. Choose the time pairing that will correctly fill in the blanks in the following sentence. Regarding the annual reconciliation report and letter of certification, the foreign trade zone operator shall prepare a reconciliation report within days after the end of the zone/subzone year and submit the letter of certification within working days after the annual reconciliation report is prepared.
A) Ten (10) days – Ninety (90) working days
B) Thirty (30) days – Sixty (60) working days
C) Sixty (60) days – Thirty (30) working days
D) Ninety (90) days – Ten (10) working days
E) Thirty (30) days – Ten (10) working days
[bg_collapse view=”button-green” color=”#4a4949″ icon=”arrow” expand_text=”Show Answer and Citation” collapse_text=”Hide Answer and Citation” ]
The Answer is: D
Citation: 19 CFR 146.25
[/bg_collapse]